Image Alt

Unit 5 – Easter Park

Unit 5 – Easter Park

 

The Commercial Unit Refurbishment project aimed to enhance the functionality, aesthetics, and safety of this commercial property. Through meticulous planning and execution, the project successfully transformed the premises into a modern, efficient, and visually appealing workspace.

Scope of Work:

  1. New Decoration Works:
    • The project included comprehensive decoration works encompassing both office and warehouse areas. Utilising high-quality materials and skilled craftsmanship, the interiors were revamped to reflect a professional and inviting atmosphere.
  2. Epoxy Coated Floor:
    • A key aspect of the refurbishment involved applying epoxy coating to the floors. This durable and seamless flooring solution not only enhanced the aesthetics but also improved durability and resistance to heavy foot traffic and other stresses.
  3. New Electrics:
    • To meet contemporary safety standards and operational requirements, new electrical systems were installed throughout the office and warehouse areas. This involved upgrading wiring, outlets, and fixtures to ensure reliable and efficient power distribution.
  4. New Double Skin Roof Lights:
    • The introduction of new double skin roof lights significantly enhanced natural light penetration into the commercial unit. This not only reduced the reliance on artificial lighting but also created a more conducive working environment that promotes productivity and well-being.
  5. Flooring Replacement:
    • As part of the refurbishment, all existing flooring was replaced with high-quality materials tailored to the specific needs of each area. The new flooring not only improved aesthetics but also addressed functional requirements such as durability and ease of maintenance.
  6. External Area Jet Washing:
    • External areas, including cladding, were meticulously jet washed to remove dirt, grime, and other debris. This restoration process not only revitalised the exterior appearance but also contributed to the overall cleanliness and maintenance of the premises.

Conclusion: The Commercial Unit Refurbishment project stands as a testament to Lancing’s commitment to excellence in property management and enhancement. By implementing a comprehensive scope of work, encompassing everything from aesthetic upgrades to functional enhancements, the project has successfully revitalised the commercial unit, creating a modern, safe, and inviting workspace for occupants and visitors alike.

Project Info

Date: